IE in Apparel Manufacturing-6: Making of Operational Bulletin

by Prabir Jana

16-February-2015  |  18 mins read

Operation breakdown and sequence of operations are not important in the Make Through System since one operator sews the complete garment, but they are critically important in an Assembly Line because the construction of a garment is planned in steps where different operators are responsible for sewing different parts of the same garment, and each […]

Content Locked

Fresh content on a daily basis. Choose from over 20,000+ articles with in-depth coverage of all aspects of the textile value chain, including future directions and trending debates.

Share This Article